Track Records

LNG Receiving Terminal Expansion Project Phase II


img

Project Description
Fabrication & Construction for Mechanical work for 2 nos 160,000 m3/tank
Scope of Work
Construction
Client
IHI Corporation
Owner
PTTLNG Company Limited
Location
Map Ta Phut Rayong, Thailand
Duration
July 2014 - December 2016

Upstream Project for Hygiene and Value Added (UHV)


img

Project Description
Engineering, Procurement, Fabrication and Construction of 7 Nos of Spherical Tank as 43,270 m3 and 20 Nos of Storage Tank as 148,900 m3
Scope of Work
EPC
Client
SK Engineering & Construction Co.,Ltd.
Owner
IRPC Public Company Limited
Location
Map Ta Phut Rayong, Thailand
Duration
July 2013 - December 2015

Ammonia Storage Tank and Facilities Project


img

Project Description
1 unit of Double Wall Tank 50,000 m3 for Ammonia Storage, Substation Building, Boil Off Gas Unit, Flare System, Marine loading arm, Seawater System, Heat Exchanger, A/G & U/G Piping, Pipe rack/bridge, Road work, and Commissioning work
Scope of Work
EPC
Client
PTT Tank Terminal Company Limited
Owner
PTT Tank Terminal Company Limited
Location
Map Ta Phut Rayong, Thailand
Duration
January 2009 - February 2011

TOP New Tank Project


img

Project Description
5 Nos of Storage Tank 188,634 m3 with internal floating roof (Glass Reinforce Epoxy Type & Aluminum Dome Roof)
Scope of Work
EPC
Client
Thai Oil Public Company Limited
Owner
Thai Oil Public Company Limited
Location
Sriracha, Chonburi, Thailand
Duration
June 2011 - July 2013

MOC Cracker Project


img

Project Description
Engineering, Procurement, Fabrication and Construction of 9 Nos of Spherical Tank as 45,390 m3 and 10 Nos of Storage Tank as 142,548 m3
Scope of Work
EPC
Client
Map Ta Phut Olefins Co., Ltd.
Owner
Map Ta Phut Olefins Co., Ltd.
Location
Map Ta Phut Rayong, Thailand
Duration
November 2006 - April 2009

PTTEP-LKU-F Desanding Package


img

Project Description
Design and Supply Pressure vessel , piping, with Skid and Sand bin Skid W3200xL3300xH5800 (Total Weight 16 Ton)
Scope of Work
EPC
Client
Schlumberger Overseas S.A.
Owner
PTT Exploration and Production Public Company Limited
Location
LKU Site, Kampangpet, Thailand
Duration
01/03/2015 to 01/09/2015

Sakc Expansion


img

Project Description
Design and Supply 3 Unit of Bullet Tank
  • Ø5600 xL24200 (Weight 83.6 Ton) 1 Units
  • Ø 4000 x L24000 (Weight 50.3Ton) 2 Units
  • Scope of Work
    EPC
    Client
    SUHDE (Thailand) Limited
    Owner
    SAK Chaisidhi Company Limited
    Location
    Map Tha Phut, Rayong, Thailand
    Duration
    11/08/2012 to 26/04/2013

    C5 Project


    img

    Project Description
    Design and Supply 4 Unit of Reactor with Jacket & Half Pipe Ø3500xL6350 (Weight 30 Ton per Unit)
    Scope of Work
    EPC
    Client
    BST Specialty Company Limited
    Owner
    Foster Wheeler (Thailand) Limited
    Location
    Amata City Rayong
    Duration
    29/03/2012 to 7/09/2012

    JG Summit PE Capacity Expansion


    img

    Project Description
    Design and Supply Product Purge bin Ø 4743 x L34777 (Weight 108 Ton)
    Scope of Work
    EPC
    Client
    Toyo-Thai Corporation Public Company limited
    Owner
    Toyo-Thai Corporation Public Company limited
    Location
    Map Tha Phut, Rayong, Thailand
    Duration
    28/09/2012 to 05/02/2013

    Fabrication of Heat Exchanger E-2103


    img

    Project Description
    Design and Supply Inner bore welding Heat Exchanger Ø 1850xL20547 (Weight 80 Ton)
    Scope of Work
    EPC
    Client
    PTT Global Chemical Public Company Limited
    Owner
    PTT Global Chemical Public Company Limited
    Location
    Map Tha Phut, Rayong, Thailand
    Duration
    29/09/2014 to 20/06/2015